Number of structural mitigation measures in place to protect against major hazard threats built [using local labour, skills, materials and appropriate technologies as far as possible]

Number of structural mitigation measures in place to protect against major hazard threats built [using local labour, skills, materials and appropriate technologies as far as possible]

Code:
Result Level:
  • Outcome
Objectives:
  • Disaster Risk Reduction and Natural Resources Management
Description:

mitigation measures such as: embankments, flood diversion channels, water harvesting tanks, etc.

Disaggregated By:

Geography/Livelihoods zone; Wealth groups; Livelihoods group (e.g. pastoralist, farmers, traders); Period to achieve the objective;

Direction of change:
  • Increase (number)
Data source:

Both secondary and primary data collection can be used according to context. Baseline/Endline. (related to availability/coverage) in a geographical area. If multiyear programme consider also a mid-term evaluation Secondary data. Reliable/relevant sources from other actors, clusters or government. Data Collection methods: Secondary data analysis; Households Survey, Focus Group Discussion; Natural resources assessment/analysis; Field surveys; Observation; Records of community meetings; Ministry records;

Sector/Subsector:
  • Livelihoods and Natural Resources Protection
Source: DFID-1
Examples:

Measure Notes:

The indicator analyzes the number of mitigation measures adopted: infrastructures available; the change in their coverage; the improvement of the infrastructures and the preparation of protection measures to promote services' resilience